V2 Mainboard Installation Guides

Guide to installing the new V2 mainboards in all Robox Models

Preparing your V2 Mainboard for installation (Robox & RoboxDual)
Your robox mainboard should have shipped with 6 TMC2226 stepsticks and 6 Heatsinks. Before installing check that there red jumpers (a few have black) ac...
Tue, 6 Apr, 2021 at 4:55 PM
Robox / Roboxdual V2 Mainboard Installation Guide
This is a guide to removing your existing board and fitting the new V2 mainboard. CEL UK holds no responsibility for boards damaged while fitting and would ...
Wed, 7 Apr, 2021 at 8:48 AM